Sure enough had to bring in the big equipment to finish the trenching. No problem for the backhoe.
Sunday I got about half of the pipe in the ground. Michelle and Kendall were helping clean out trenches and I was doing the piping. Monday I stayed home to finish the piping and fixing the main water line I broke two times. Had Tom, Tommy, Nick, Warren, Michelle, Kendall, and Kole all helping me finish by filling in the trenches. I left the front trenches open so I can run some wire for the sidewalk lights. Once thats done and the ditches settle and some backfill brought in, I will be ready for some instant grass, cant wait.Monday, August 11, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment